Additional revenue from renewable energy
HASHLYNK systems make surplus electricity economically useful on site, instead of leaving it unused or exporting it below its value.
Increase revenue and reduce heating costs with intelligent building technology and custom engineering solutions.
Start your site assessmentThe potential
Operators of solar plants and other renewable energy sources face the economic challenges of falling feed-in tariffs, negative electricity prices and strict grid export limits.
Our systems turn your surplus electricity into computing power the moment it is generated, and with it into revenue, fully automated through Bitcoin mining.
Our systems
Our product family meets a range of site requirements. From compact entry-level solutions to integrated systems for higher capacities and complex energy infrastructure.

5–20 kW
A compact system for residential buildings and small businesses.

20–60 kW
A modular rack system for businesses with medium surplus profiles.

40–60 kW
An industrial micro data centre for large renewable energy systems.

Included in all systems
Fully automatic surplus control – integrated into every system and also available separately.

Entry-level solution
1–2 miners plus a HashLink Automation Controller – ideal for getting started.

A self-contained unit for ground-mounted solar parks, power plants and large generation sites.

Custom project planning, control cabinet construction, automation and software for special solutions in electricity utilisation and heat recovery.


More from every kWh
HASHLYNK systems make surplus electricity economically useful on site, instead of leaving it unused or exporting it below its value.
HASHLYNK systems integrate behind the meter into existing infrastructure, using energy where it is generated.
The heat generated can be reused on site, creating additional value beyond electricity utilisation.
Applications

For sites with their own generation, regular surplus electricity and the goal of making better economic use of locally available energy.

For plants where grid export becomes economically unattractive or additional utilisation options alongside electricity sales are relevant.

For projects where electricity utilisation, heat recovery and site requirements should be planned together from the start.

For businesses with their own generation, year-round energy demand and the potential to integrate surplus electricity and heat into daily operations.

For farms with PV systems or other renewable energy sources, seasonal load profiles and a need to make better use of locally generated energy than simply exporting it to the grid.

As an optimiser and add-on for PV systems, particularly where self-consumption can be increased and heat can support existing heating systems.
Sites with grid export limits
For applications where additional locally generated energy can only be exported to a limited extent or on economically unattractive terms.
Sites with heat demand
For businesses that can use the heat generated in existing processes or building services alongside electricity utilisation.
Delivered so far


















Your steps to a project
Our project process brings together technical feasibility, economic viability and on-site integration from the start. This turns an initial idea into a robust project with a clear path to implementation.
Together, we review surplus profiles, heat demand, grid conditions and the operational requirements at your site.
Based on your site data, we develop a system configuration that is technically compatible and economically sound.
We carefully prepare the electrical connection, controls, heat recovery and interfaces with your existing infrastructure.
After commissioning, the system is fine-tuned to actual operating conditions, monitored and managed reliably in everyday use.
Who we are
A young team from Carinthia with a clear goal: surplus electricity should deliver value instead of going to waste. From the first idea to day-to-day operation, we plan thoroughly, build to industrial standards and work honestly.

FAQ
Surplus electricity is converted into computing power and additional usable heat. This creates economic value from energy that would otherwise have limited uses.
Computing power is rewarded in Bitcoin. The most appropriate utilisation strategy depends on the site, the time horizon and the economic objectives.
Plant size alone is not decisive. The surplus profile, heat demand and integration into existing infrastructure are particularly important.
Depending on the system design, high usable temperatures are possible, typically up to around 80 °C. The actual level depends on load control, hydraulics, flow rate and the connected heating infrastructure.
Heat rejection is included in the design for this situation. This keeps operation technically stable even when there is temporarily no active heat use.